Observed Scheduling Patterns at ERCOT During Aug. 2001
•Consistent overscheduling of generation in the South Zone which resulted in significant resource imbalance credits to QSEs from ERCOT.
•Consistent overscheduling of load in the North Zone which resulted in significant load imbalance credits to QSEs from ERCOT.